Classic Blog

April 14 2015 0comment
Steger & Associates

Canberra Brickwork Environs and Cotter Road Stage 3 Upgrade

Client – Land Development Agency, Canberra (LDA) Location – Canberra, YARRALUMLA Time frame – 2014/15, 3 Months Project Description Project combined multiple agencies and consultants to provide extensive coverage for a comprehensive engineering survey for road duplication design and land development within the Yarralumla brickworks precinct. Scope included a full site investigation for base engineering detail, […]

April 13 2015 0comment
Steger & Associates

Canberra Light Rail – UG Utility Investigations and Survey

Client – Calibre Consulting & Capital Metro Authority Location – Canberra, Gunghalin to City (12km) Time frame – 2014/15, 6 Months Project Description Scope included engineering/topographic survey combined with investigation & survey data capture of existing U/G utilities. Scope of works comprised of detail survey, service tracing, slit trenching and over 1600+ potholes within proposed alignment corridor […]

January 12 2015 0comment
Steger & Associates

Canberra City to Lake – Engineering detail and Hydraulics Investigations

Client – Land Development Agency, Canberra (LDA) Location – Canberra, CITY Time frame – 2014/15, 3 Months Project Description Project included full engineering survey for expanded survey over CITY precinct to provide base topographical survey for future design. Scope included bathymetric survey for Lake Burley Griffin for water front analysis and design and multiple hydraulics […]

August 10 2013 0comment
Steger & Associates

North Weston Pond Reticulation Network

Client – INDESCO Location – Canberra, WESTON CREEK Time frame – 2013, 2 Months Project Description Urban water reticulation network engineering survey for connection of major lakes and water bodies to service open space playing fields and ovals. Scope included detailed topographic survey and U/G services investigation of impacted utilities for network design. Difficulties included […]

June 11 2013 0comment
Steger & Associates

Gundaroo Drive Duplication Engineering Detail

Client – AECOM & ROADS ACT Location – Canberra, GUNGAHLIN Time frame – 2013, 3 Months Project Description Large scale road duplication project requiring extensive investigation and detail coverage. Site control established for entire length of project with attention to post design construction and longevity. Included extensive hydraulics analysis and services location and pothole confirmation […]